Monday, June 18, 2012
Why The Greener Greens
Turfgrass managers use an almost infinite number of tools at their disposal to protect and maintain their putting greens. While aeration, sand topdressing, and properly used fungicides are examples of tools that are recognized by most golfers, less common tools are not as easily observed by golf course patrons. The picture of the 9th putting green on the White Nine provides an example of one such practice. If you look carefully, you will notice that the right half of the green is much darker in appearance than the left side of the green. At the time the photograph was taken, only half of the green had been sprayed. In addition to our usual application of fungicides, growth regulators, fertilizers, and bio stimulants, a turfgrass pigment was also added.
We initially discovered the benefits associated with turf pigments when applying fungicides to fairways in the late fall to prevent snow mold. The particular fungicide that was applied came pre-mixed with a turfgrass pigment. We realized the benefits of the pigment in the early spring of the following year. Due to the darker color of the fairway following the application of the pigment, the fairways greened up much earlier than normal. We believe this occurred due to the warmer canopy temperature afforded by increased solar radiation adsorption due to the darker colored turf. Often times, we will apply pigments early and late in the season to promote turfgrass growth.
Additionally we will apply products containing pigments or add pigments when spraying greens in the summer. In summer time, the pigment acts as a sunscreen, shielding the turf from intense solar radiation. Temporarily following the application, the putting surfaces take on a vibrant green color.
Monday, May 14, 2012
Technology and Turf-Moisture Management
| Turf Guard Installation |
![]() |
| TDR Field Scout 300 |
| Turf Gaurd |
Tuesday, May 1, 2012
Fairway Sand Topdressing and Maintenance
Friday, April 6, 2012
Golf Season Begins With Course In Great Shape
- Putting Greens: The greens have been verticut and topdressed. Growth regulators have been applied to reduce annual bluegrass seedhead production. Mowing heights and fertility will be manage to allow for adequate recovery and growth.
- Tees: The tees have been verticut and topdressed as well. We will place the tee markers toward the front of tees for a couple more weeks in order to preserve the primary hitting areas for the upcoming season.
- Fairways: The fairways have come out of winter in the best shape that I have ever seen--they currently appear as though it is mid-June. Our equipment technician Jim is currently solid-tine aerifying all fairways. He has completed the White Nine and is currently working on the Red Nine. Once Jim completes this process, the golf course maintenance staff will begin verticutting fairways in preparation for our first sand topdressing application.
- Pump Station Improvements: The pumps in the pumping station on the White Nine have been completely rebuilt and installed. The irrigation system was pressurized yesterday. The golf course maintenance staff will repair all leaking pipes and sprinkler heads in the coming weeks.
- Stump Hole Repair: The warm weather and dry conditions have allowed the golf course maintenance staff to get an early jump on repairing the stump holes created following the removal of trees in the fall of 2011. While most holes were leveled off and seeded, the golf course maintenance staff sodded the largest stump holes located close to the fairways on 1 White and 3 White.
Take advantage of the warm temperatures this weekend and come out and play the course. Follow your round by watching the Masters in the clubhouse!
Wednesday, February 22, 2012
Irrigation System Maintenance and Improvements
Understanding this, the NSCC Board of Directors approved two major deferred maintenance projects which will guarantee proper irrigation function for years to come.
The Board approved the following maintenance work to the pump station on 7 White:
- Restore the support frame that holds all four pumps above the wet well.
- Restore the 60HP pump to peak efficiency
- Rebuild and add an additional stage to the 20HP in order to meet the higher pressure demand that our system now operates at
- Service the 30HP pump and motor
The Board also approved the following upgrades to the irrigation control system since our current control system is no longer manufactured and now obsolete. In fact, some electronic repair parts are no longer available for purchase:
- Replace the 27 on-course Network 800 controllers with 15 new Lynx controllers
- Replace the 12 year-old central computer with a new computer and software
While these projects do not necessarily have the appeal of a renovation project, they are critical to course conditioning. All installation and repair work is currently underway. The new system will be up and running to begin the season.
Wednesday, November 30, 2011
Tree Removal Project
Following a thorough examination of the Blue and White Nines, the Grounds and Greens Committee identified a total of 53 trees for removal. All trees slated for removal were chosen for one of the following reasons:
- Poor Tree Health
- Safety Concerns
- Creating A Poor Environment For Growing Turf
- Playability Issues/Previously Identified In Forse Master Plan
The removal process began in November on the Blue Nine. All work including removal, brush chipping, stump grinding and backfilling has been completed utilizing NSCC staff and equipment. The final seeding of the stump holes will be completed in Spring when conditions allow.
While evergreen trees were the most common tree removed, a few deciduous trees did make the list. The picture above taken following the felling of a willow tree on 3 White illustrates how labor intensive this process is. The diameter of the tree is greater than height of our staff member!
